En
Ru Fr Es

Completed projects

  • UAZ-Avtokomponent LLC
    Ульяновск
    Hazard Class 1 collection and transportation services: Trichlorodiphenyl capacitors, waste. 2014, 2015
  • Ozersk Industrial Company CJSC
    Озеры
    Collection of transformers with pentochlordiphenyl, hazard class 1. 2015
  • AO «KNPZ»
    самара
    Collection on the territory of JSC "KNPZ", transportation and neutralization of metal structures (transformers with spent pentochlorodiphenyl) containing hazard class I-IV. 2015
  • OJSC "Privolzhsknefteprovod"
    Саратов
    Oil Quality Measurement Unit (BIC)
  • JSC "Kaliningradgasification"
    Калининград
    Manufacture and supply of cabinet regulatory points
  • LLC "OilTechnoService"
    Калининград
    Vapor Recovery Installation
  • LLC "ENHA"
    Белгород
    Manufacturing and delivery. Pipe Testing Installations (TPU)
  • CJSC "ROSPAN International" (Russian Federation)
    Gas metering unit and gas condensate.
  • CJSC "ROSPAN International"
    Methanol pumping station in block-modular design
  • JSC "Transpetrol"
    TPU 1900 ANSI 150, Block of Oil Quality Indicators
Fill out the form and we will call You back