Manual clearing of the routes of a high-voltage line 500, 220 kV, 1,425.22 hectares with shredding of logging residues.
Branch of OAO "IDGC of Urals" - "Permenergo»
Челябинск
Manual clearing of routes of 6-110 kV overhead lines in production associations Kungursky, Ochersky, Tchaikovsky and Chusovsky electric networks in the amount of 1,554.87 hectares
OJSC "Fortum", Chelyabinsk GRES
Челябинск
Customer Engineer of a gas turbine power station based on 3 Alstom gas turbines with a capacity of 750 MW
OAO "LUKOIL"
Томск
Technological complex of the system for measuring the amount of oil and gas.
OOO Gazpromneft-Vostok (Russian Federation)
Томск
Manufacture and supply of pipe piston calibration installation