Completed projects

  • The branch of JSC "FGC UES" - Sverdlovsk PMES
    Челябинск
    Manual clearing of the routes of a high-voltage line 500, 220 kV, 1,425.22 hectares with shredding of logging residues.
  • Branch of OAO "IDGC of Urals" - "Permenergo»
    Челябинск
    Manual clearing of routes of 6-110 kV overhead lines in production associations Kungursky, Ochersky, Tchaikovsky and Chusovsky electric networks in the amount of 1,554.87 hectares
  • OJSC "Fortum", Chelyabinsk GRES
    Челябинск
    Customer Engineer of a gas turbine power station based on 3 Alstom gas turbines with a capacity of 750 MW
  • OAO "LUKOIL"
    Томск
    Technological complex of the system for measuring the amount of oil and gas.
  • OOO Gazpromneft-Vostok (Russian Federation)
    Томск
    Manufacture and supply of pipe piston calibration installation
  • Branch "Gazpromneft-Muravlenko" JSC " Gazpromneft-NIS»
    Manufacture and supply of pipe piston calibration installation.
  • ZAO "Vankorneft"
    краснодар
    Manufacture and supply of cabinet regulatory item.
  • Dzubgenskaya TPP
    краснодар
    Consulting, commissioning of a 180 MW combined-cycle gas turbine unit.
  • Energy Center ZGK "On the waves of dreams", p. Agoy
    краснодар
    Design work for the construction of a power center with an electrical capacity of 2.75 MW and a thermal capacity of 2.2 MW.
  • Ingush GTPP
    Карабулак
    Design of GTES power 110 MW