  • OJSC Mosgaz
    Москва
    Design of 17 objects. Turboexpander unit power. More than 47 MW
  • ТЦ Праздник
    Москва
    Design and turn-key construction of a HPP based on 2 GPA x GES EH 1750 G power, 3.5 MW; 6 Gcal; 2 MW cold
  • Daimler Chrysler Автомобили РУС
    Москва
    Проектирование, поставка, строительство, монтаж ГПЭС на базе 1 ГПА х 12V400L61 (MTU); 2 ДГ х Virtus 630P5F  (MTU); 2 котла х Vitoplex100 (Viessmann) мощн.2 МВт; 3,5 МВт
  • RS Zhulebino
    Москва
    Design, production, delivery of 48 GPA x GES EH 2000 G power capacity.96 MW
  • RTS Perovo
    Москва
    Design, production, delivery of 20 GPA x GES EH 2000 G power, 40 MW
  • НК Сибнефть
    Москва
    Проектирование, производство, поставка, ШМР, ПНР, ГПЭС мощн.10,4 МВт
  • "Plant of artistic casting", Mytishchi
    Москва
    Production, delivery, installation of HPP on the basis of 3 GPA x GES EH 1750 G power, 5.5.3 MW; 5.4 MW
  • POYRY
    Москва
    Development of a concept for the construction of 3 hydropower plants on the Khrami River, Georgia
  • Autonomous power center for the motor depot depot at st. Moscow Region Railway
    Москва
    “Implementation of design works for the construction of the facility within the framework of the investment project“ Construction of a motor depot depot for maintenance of electric trains at st. The Moscow Region Railway near Moscow and the organization of equipment points in the existing depot of the Moscow Railway. node "
  • LLC "Electroset-project»
    Москва
    Turnkey construction. The complex of works on laying 2 cable lines of 10kV from the designed AvgurEstate 10kV RP in the direction of RU-10kV PS-687 Letovo, length of each feeder is 1700 meters at MO, Leninsky district, Kommunarka settlement ” Construction and assembly work