En
Ru Fr Es

Completed projects

  • OJSC "Tsaritsinsky Meat Processing Plant"
    Москва
    Pre-project work. HPP based on HPA GES power.
  • OJSC "Gazenergostroy"
    Москва
    Pre-project work. GES based on GES GES for logistic. centers in MO power 60 MW; 80 Gcal.
  • Government of Moscow
    Москва
    Pre-project work and feasibility study. 43 HPPs based on HPA GES, with a capacity from 15 to 25 MW power.
  • «POYRY»
    Москва
    Pre-project work and feasibility study. GTES Suzunsky m / r power 80 MW.
  • GK Morton, GK «Capital Group» and others.
    Москва
    Pre-project work and feasibility study. GES based on the GES GES and boiler power capacity. More than 200 MW.
  • «Biogazenergostroy»
    Москва
    Pre-project work on 20 objects. Biogas GPES based on GPU GES power
  • "Tushino 2018"
    Москва
    Pre-design works, design of the thermomechanical part of the HPP with a power of 110 MW
  • RTS "Zhulebino" OJSC MOEK
    Москва
    Design of HPP power 3 x 32 MW
  • The development of the transport and logistics system of the Moscow region.
    Москва
    Designing HPP based on the GES GPU power.60 MW; 80 Gcal
  • Pension "Pines" Office of the President of the Russian Federation
    Москва
    GES based on GES GES power, 3 MW; 8 MW
Fill out the form and we will call You back