Download presentation
The book "The Elimination of Accumulated Harm"
Submit your application
En
Ru
Fr
Es
Main
About us
News
Our team
Affiliate program
Product
Ecological risk
Local power supply
Recycling
Cleaning of drains
Object Map
Contact
On-line
Completed projects
OJSC "Tsaritsinsky Meat Processing Plant"
Москва
Pre-project work. HPP based on HPA GES power.
OJSC "Gazenergostroy"
Москва
Pre-project work. GES based on GES GES for logistic. centers in MO power 60 MW; 80 Gcal.
Government of Moscow
Москва
Pre-project work and feasibility study. 43 HPPs based on HPA GES, with a capacity from 15 to 25 MW power.
«POYRY»
Москва
Pre-project work and feasibility study. GTES Suzunsky m / r power 80 MW.
GK Morton, GK «Capital Group» and others.
Москва
Pre-project work and feasibility study. GES based on the GES GES and boiler power capacity. More than 200 MW.
«Biogazenergostroy»
Москва
Pre-project work on 20 objects. Biogas GPES based on GPU GES power
"Tushino 2018"
Москва
Pre-design works, design of the thermomechanical part of the HPP with a power of 110 MW
RTS "Zhulebino" OJSC MOEK
Москва
Design of HPP power 3 x 32 MW
The development of the transport and logistics system of the Moscow region.
Москва
Designing HPP based on the GES GPU power.60 MW; 80 Gcal
Pension "Pines" Office of the President of the Russian Federation
Москва
GES based on GES GES power, 3 MW; 8 MW
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Fill out the form and we will call You back
Order a call