Production and supply for the N.Chelny-Almetyevsk oil pipeline to the Nizhnekamsk Refinery PSP system for measuring the amount and indicators of oil quality (SIKN)
JSC TEK Mosenergo
Москва
Manufacture and supply of a condensate tank with a volume of 14m?
Branch of JSC “MOESK” - Eastern Electric Networks
Москва
Reconstruction of 35-220 kV overhead lines (extension of the windfarm windbreaks) (19 titles) for the needs of Eastern Electric Networks, a branch of OJSC "MOESK"
Branch of JSC “MOESK” - Northern ES
Москва
Reconstruction of the 6-10 kV HVL, connected with bringing the glades to a standard condition (within the protective zones of the HL) in Krasnogorsk, Solnechnogorsk, Klin, Taldomsky RES, 58.588 hectares with disposal of logging residues.
JSC FGC UES - MES Center
Москва
Work on the manual clearing of glades (highways) overhead lines with disposal of logging residues of the Moscow PMES in the amount of 390.42 ha.
Branch of JSC FGC UES - Vyborg PMES
Москва
Manual clearing of the routes of the overhead line of the Vyborg PMES in the amount of 1023.08 hectares
Mini-TPP for the stadium "Spartak"
Москва
Turnkey construction of a hydropower plant based on 12 GPU x GES EH 1750 G, power 25 MW; 29 Gcal / h
New Moscow GPO "Trinity"
Москва
Implementation of the feasibility study and pre-project studies for the power plant of 109.9 MW (Pre-design works, general plan, thermal mechanics, architecture, without power distribution schemes).
New Moscow GPES "Kommunarka"
Москва
Implementation of the feasibility study and pre-design studies for the power plant of 183 MW (Pre-design works, master plan, thermal mechanical part, architecture, without power distribution schemes).
GK "Morton"
Москва
Design and engineering documentation for the construction of a boiler house with a total thermal capacity of 90 MW