Eliminating sites of environmental damage accumulated in the Nizhny Novgorod Region (the Black Hole industrial waste dumpsite, the White Sea slurry pit, the Igumnovo domestic solid waste landfill), including preparing design and estimate, construction and technological documentation, conducting appraisal of the design documentation required in accordance with the current legislation, as well as other works related to the elimination of these sites.