Turnkey construction. Development of projects and Execution of works on the 0.4-10 kV distribution networks and the 6-10 kV switchgear of 35-220 kV substations with technological connections of consumers for the Southern Electric Networks of JSC “MOESK” in 2008/2009 ”(design works, construction works CL, VL0,4-10kV, installation of equipment, supply of equipment and materials)