Turnkey construction. The complex of works on the construction of a 10 kV cable line from the RP under construction near the village of Dudkino to the power receiving devices SNT "Gifts of Nature"
Southern Electric Networks - branch of JSC “MOESK”
Подольск
Turnkey construction. Installation of the outgoing cell in the 10 kV RU built under the contract 7894 ^ 09. Construction of CL-10 kV from the specified RP-10 kV, PS No. 677, "Teply Stan", including PIR, MO, Leninsky district, D. Salaryevo.
Southern Electric Networks - branch of JSC “MOESK”
Подольск
Turnkey construction of 2 10 kV cable lines from different sections of PS 708 busbars with disassembly, f.15, installation of 10 kV KRUN. Stage 3 Construction of 2BKTP-1000 with dismantling of the TP-889, power supply to be carried out by replanting the previously built Ф.15 and according to the "inlet-exit" CL-10 kV direction "PS 708-1167
Southern Electric Networks - branch of JSC “MOESK”
Подольск
Construction of "turnkey" BMKTP-400/10 / 0.4 kV, taps VLZ-10 kV from f.3 RP-9, VLI-0.38 kV, PS №771 "Malino", Stupinsky district, d. Dubnevo. Design work.