En
Ru Fr Es

Completed projects

  • OAO Fortum, Chelyabinsk State District Power Plant
    Челябинск
    GTES on the basis of 3 Alstom GTUs with a power of 750 MW.
  • Kazan CHP-2
    Казань
    Supply and installation of auxiliary equipment. PGU power.220 MW
  • «Innopolis»
    Казань
    Pre-project work and feasibility study
  • Riga sea port
    Рига
    Thermolysis plants for the processing of used car tires and MSW mogutn.
  • Poultry Farm
    Уфа
    Supply and installation of wastewater treatment systems
  • Bashkirenergo
    Уфа
    Design, production, delivery, WDD, PNR, GEPP moszh.28 MW
  • SNT "Gifts of Nature"
    Turnkey construction. The complex of works on the construction of a 10 kV cable line from the RP under construction near the village of Dudkino to the power receiving devices SNT "Gifts of Nature"
  • Southern Electric Networks - branch of JSC “MOESK”
    Подольск
    Turnkey construction. Installation of the outgoing cell in the 10 kV RU built under the contract 7894 ^ 09. Construction of CL-10 kV from the specified RP-10 kV, PS No. 677, "Teply Stan", including PIR, MO, Leninsky district, D. Salaryevo.
  • Southern Electric Networks - branch of JSC “MOESK”
    Подольск
    Turnkey construction of 2 10 kV cable lines from different sections of PS 708 busbars with disassembly, f.15, installation of 10 kV KRUN. Stage 3 Construction of 2BKTP-1000 with dismantling of the TP-889, power supply to be carried out by replanting the previously built Ф.15 and according to the "inlet-exit" CL-10 kV direction "PS 708-1167
  • Southern Electric Networks - branch of JSC “MOESK”
    Подольск
    Construction of "turnkey" BMKTP-400/10 / 0.4 kV, taps VLZ-10 kV from f.3 RP-9, VLI-0.38 kV, PS №771 "Malino", Stupinsky district, d. Dubnevo. Design work.
Fill out the form and we will call You back