Completed projects

  • Gazpromneft-Muravlenko branch of OAO Gazpromneft-NNG
    Izgotovleniye i postavka truboporshnevoy poverochnoy ustanovki. 60/5000 Manufacture and supply of pipe piston calibration installation.
  • OAO RN-Yuganskneftegaz
    Manufacturing Filter unit (2pcs.)
  • UDP "Shurtanneftegaz" (Republic of Uzbekistan)
    The modular fuel gas treatment system. Pipe-mounting unit 250m3 / h ANSI 600 in a block box 12x3x3 m
  • UDP "Shurtanneftegaz"
    The modular fuel gas treatment system. Construction of a booster compressor station-2 at the field "Shurtan".
  • JSC FGC UES - Karelian PMES
    Performing the IRD and expanding the glades of overhead lines at the facilities of the Karelian PMES (L-224 Lyaskel - Suoyarvi)
  • JSC "MN" Friendship "(Russian Federation)
    Брянск
    Manufacture and supply of a block of measurements of oil quality indicators (BIC).
  • LLC "Center for Assistance to Investment Projects in the Field of Land and Property Relations"
    Брянск
    Design and engineering documentation for the following energy facilities: Boiler house with a heat capacity of 43 MW, a power complex with a capacity of up to 40 MW, a thermal power plant with an electrical capacity of up to 40 MW, a heat and power plant with an electrical capacity of up to 4.5 MW, in the territory of the Michurinskoye Rural Settlement
  • LLC "NOVATEK"
    Челябинск
    Manufacture and supply of mobile calibration equipment based on FMD compact prover
  • Branch of IDGC of Urals, OAO - Sverdlovenergo
    Челябинск
    Clearing and expanding the routes of 6-110 kV overhead lines from forest plantations
  • Branch of IDGC of Urals, OAO - Sverdlovenergo
    Челябинск
    Works on clearing the routes and conducting selective cutting and clear cutting of trees within the protected zones of 6-110 kV high-voltage lines in the amount of 832.76 hectares (by hand).